View Issue Details

IDProjectCategoryLast Update
0029313Heart Of The MachineClarity NeededAug 26, 2024 6:04 am
ReporterFluffiest Assigned To 
Status newResolutionopen 
Product Version0.585 Build And Settings Menus Partial Updates 
Summary0029313: Could really do with some more clarity on build times
DescriptionWhen I select a building from the build menu, it tells me the turns to construct and the self construction speed, but not the time for job installation or the total work required (which matters because, for some structures, it's not a whole number multiple of the construction speed).

When I place a building, the blueprint shows me the remaining build time, the build-points-per-turn, the time for job installation, AND breaks down the work for each phase.

When I select a technician and hover over an under-construction building, the game tells me the amount of construction per turn the technician will add (which is extremely high compared to the structure's work required), but regardless of the structure, the duration is always listed as two turns.

After assigning a technician, the building's tooltip does NOT change to reflect the newly added construction speed.

For an illustration of why I'm confused, please see the attached save. If you just pass turn, the wind generator takes six turns to complete and one turn to install the job. If you assign one technician to assist it, it finishes construction next turn but takes a turn to install the job (The mouseover text says this will take two turns, but the technician becomes free to do something else on the very next turn, regardless of the job installation being unfinished). If you assign *both* available technicians, the generator finishes completely next turn, including job installation.

Ideally, when I have a technician selected and am hovering over an under-construction building, the tooltip should tell me the remaining construction time, including job installation, AND what this will be reduced to if I send the technician to help. After sending a technician to work on a building, the building's tooltip should change to reflect the new construction time.
TagsNo tags attached.

Activities

Fluffiest

Aug 21, 2024 8:53 pm

reporter  

build time clarity.save (4,215,848 bytes)

Fluffiest

Aug 26, 2024 6:04 am

reporter   ~0070040

Also, the game will let me assign a technician to "help" with a structure that has a 1-turn build time and 1-turn job installation time. This has absolutely no benefit; the build still takes one turn and the job installation still takes one turn. The game doesn't tell me that there's no benefit to doing this.

Issue History

Date Modified Username Field Change
Aug 21, 2024 8:53 pm Fluffiest New Issue
Aug 21, 2024 8:53 pm Fluffiest File Added: build time clarity.save
Aug 22, 2024 6:27 am Fluffiest Description Updated
Aug 25, 2024 5:07 pm Fluffiest Description Updated
Aug 26, 2024 6:04 am Fluffiest Note Added: 0070040